General Mills Project Geyser
The General Mills-Yoplait plant project consisted of steam and condensate, process hot water and hot water heat recovery piping spanning the entire facility. The centerpiece was a 40’ x 40’ structural steel platform housing several plate and frame heat exchangers.
DISTRICT COUNCIL 16 MEMBER:
Xcel Mechanical Systems, Inc.
Owner:
General Mills
Contractor:
Faithful & Gould
Project Location:
Carson
California State University of Northridge Dormatory Remodels
CSUN renovated 16 buildings including replacing roof top tank
type water heaters with new Noritz tankless water heaters.
DISTRICT COUNCIL 16 MEMBER:
Suttles Plumbing
Owner:
CalState University
Contractor:
RD Olson Construction LP
Architect:
Beta Investments
Project Location:
NorthridgeSpectrolab Super Project
The expansion and retrofit of solar cell and panel
manufacturing facility included design and constructing a
Class 10,000 clean room and 400-ton central plant cooling
facility. Replacement of old central plant systems
equipment.
DISTRICT COUNCIL 16 MEMBER:
Kinetic Systems, Inc.
Owner:
Spectrolab
Contractor:
Kinetic Systems, Inc.
Architect:
Page Southerland Page LLP
Project Location:
SylmarEl Centro Unit 3 Re-Powering Project, Epc
The scope of work on this project included engineering,
fabrication,
civil/foundations, cooling tower erection, CTG and STG
erection, HRSG’s
(2), I&E, structural steel, piping, balance of plant equipment
commissioning and performance testing.
DISTRICT COUNCIL 16 MEMBER:
ARB, Inc. – Industrial Group
Owner:
Imperial Irrigation District
Project Location:
El CentroChevron Analytical Lab
Xcel Mechanical Systems, Inc. installed a fuel laboratory, test
facility for Chevron. A solar-to-steam (S.S.) fuel delivery
system was used to the test engines.
DISTRICT COUNCIL 16 MEMBER:
Xcel Mechanical Systems, Inc.
Owner:
Chevron
Contractor:
C.C. Layne and Sons
Architect:
Jacobs
Project Location:
El SegundoLAX – Tom Bradley International Terminal
Everything prefabricated, using GPS software to layout over
9,354 field points including 1,056 pipe spools, hot/chilled
water, glycol and 43,646 linear feet of pipe.
DISTRICT COUNCIL 16 MEMBER:
All Area Plumbing, Inc.
Owner:
Los Angeles World Airports
Contractor:
Walsh Austin Joint Venture
Architect:
Fentress Architects
Project Location:
Los AngelesGWF Tracy
PMI installed 25 cell air-cooled condensers and turbine exhaust
duct. The project included approximately 3,042 feet of large-bore
pipe, 1,320 feet of small-bore pipe, 1,424 tons of structural steel,
107 tons of platforms, and 170 cubic feet of grout.
DISTRICT COUNCIL 16 MEMBER:
Performance Mechanical, Inc.
Owner:
GWF Power Systems
Contractor:
Performance Mechanical, Inc.
Architect:
PB Power
Project Location:
Tracy